Colorado outdoor estate preconstruction checklist.

A disciplined starting document for major Front Range projects. Use it to expose missing decisions—not to replace parcel-specific professional advice.

Download plain-text checklist
01

Property record

  • Current boundary and topographic survey
  • Title, easements, and recorded restrictions
  • Existing plans and available permit records
  • Utility locations, capacities, and providers
  • Trees, drainage, grade, soils, access, and known hazards
02

Authority map

  • Municipal or county jurisdiction confirmed
  • Zoning and overlay districts confirmed
  • Building and land-disturbance permit paths identified
  • Fire, water, sanitation, and utility reviews identified
  • Applicable association or design-review process identified
03

Owner brief

  • Decision-makers and approval authority named
  • Estate thesis and priority uses stated
  • Capital range and reserve strategy stated
  • Target planning and construction windows stated
  • Occupied-home, privacy, security, and access constraints recorded
04

Professional team

  • Architecture and landscape leadership assigned
  • Civil, structural, geotechnical, pool, lighting, wildfire, and specialty needs tested
  • Responsibility matrix issued
  • Professional licenses verified where applicable
  • Deliverables, meetings, revisions, and construction-phase roles compared
05

Builder diligence

  • Comparable complexity reviewed
  • Preconstruction process documented
  • Proposed leadership and field team identified
  • Insurance and relevant registrations verified
  • References asked about communication, changes, closeout, and problem solving
06

Commercial controls

  • Scope, assumptions, exclusions, and owner items written
  • Allowances state quantity, quality, labor, freight, tax, and markup
  • Owner and builder contingencies separated
  • Change authorization and emergency rules documented
  • Monthly cost, schedule, procurement, and decision reporting defined
07

Approval and execution

  • Permit and design-review matrix scheduled
  • Long-lead selections and procurement dates identified
  • Site logistics, staging, temporary protection, and neighbor interface planned
  • Inspection, testing, commissioning, and closeout requirements scheduled
  • Landscape establishment, warranty, and seasonal maintenance responsibilities assigned